Building completion and use certificate (Or.6): what Section 32 requires and what to ask a villa seller
The Building Control Act requires the owner of certain controlled-use buildings, such as hotels and condominiums, to notify the local official on completion and obtain a certificate before using the building. For a villa, ask for the permit and any Or.6 and check that the approved use matches how the building is actually used.
Right Way Phangan · Editorial
Updated 30 September 2026
If a Koh Phangan villa has a building permit, is that enough? A permit covers construction. Under Section 32 of the Building Control Act B.E. 2522, some building types also need an inspection and a certificate after completion, issued on Form Or.6, before they are used.
What the Act says
- Section 31 — no one may build, alter, demolish or move a building in deviation from the approved plans and specifications.
- Section 32 — for controlled-use buildings (listed types include warehouses, hotels, condominiums, health facilities and buildings for commercial, industrial, educational or public-health activity), the licensee must notify the local official on completion within 30 days, and the official inspects. After approval, a certificate permitting use is issued.
- Penalties (Section 65) — breaches of Sections 31 and 32 are punishable by up to three months' imprisonment, a fine of up to THB 60,000, or both, plus a daily fine of up to THB 10,000 while the breach continues.
- Tall or very large buildings — an engineer's inspection certification is also required, and the application and inspection process is described as taking up to 30 days.
What it means for a villa buyer
- A private house is not among the listed types — I found no source confirming how strictly local offices require an Or.6 for an ordinary residence, so ask the local municipal or sub-district (TAO) building office rather than assuming either way.
- Use must match the approved purpose — practitioner sources say a residential building run as a hotel risks orders to stop that use and fines, and a hotel needs a permit that shows the hotel purpose; see renting out a villa and the hotel licence and the 2026 short-term rental crackdown.
- Build matches plan — a villa built differently from its permit engages Section 31; see verifying building permits and building a villa.
- Existing duty to keep buildings safe — Section 32 is also described as a continuing duty on owners; periodic inspection of large buildings is covered in Section 32 bis.
Checklist to ask the seller
- The building permit and approved plans, compared against the real building.
- Any completion or use certificate (Or.6) issued, and the stated use.
- Any notice, order or fine from the local office.
- Whether the plan to rent short-term is allowed on the approved use.
This is general information, not legal advice; the practice at each local office varies, so confirm with a Thai lawyer and the local building office.
Key points
- A building permit authorises construction; Section 32 adds a completion inspection and use certificate for controlled-use buildings.
- Section 31 prohibits building in deviation from the approved plans.
- Penalties under Section 65 reach three months' jail, THB 60,000 and daily fines of up to THB 10,000.
- Ordinary houses are not among the listed controlled types; ask the local office how it treats an Or.6.
- Check that how you use the villa, especially short-term rental, matches the approved purpose.
Sources
General information, not legal advice. Thai property law is fact-specific — verify any structure with a licensed Thai lawyer before you commit. Independent legal due diligence is part of every transaction we handle.
From reading to doing.
Every property we list passes checks like these — title, zoning, access and the real numbers — before it goes live. Browse what’s available, or find out what your own land or villa is worth.